Why this matters
Formwork failures are sudden and severe. They usually come from missing ties, wrong bracing, or early stripping.
What to cover
- Build to the drawings and don't change the bracing without approval.
- Have a competent person inspect the formwork before the pour.
- Fit edge protection as you build.
- Keep people out from under forms being lifted.
- Strip only when you've been told it's safe.
- Report loose pins, gaps, or damaged parts.
Ask the crew
- Who signs off the formwork?
- What's the strip time on this pour?
- Where's the drawing?
One thing to do today
Check the formwork against the drawing before the next pour.


