Job hazard analysis: erecting and stripping formwork

Build, brace, and remove formwork for walls, slabs, and columns.

  • 4 steps
  • 5 PPE items
  • Editable in Reldro
Two workers looking across a concrete deck with conduit and rebar laid out

The job hazard analysis

PPE required: Hard hat, Safety glasses, Gloves, Safety boots, Fall arrest harness

  1. 1. Follow the design

    What could go wrong

    Collapse from missing ties or braces

    How we control it

    Build to the design drawings. Don't change the bracing or spacing without approval.

  2. 2. Erect and brace

    What could go wrong

    Falls; falling panels; strains

    How we control it

    Fit edge protection as you go. Use a crane or hoist for large panels. Keep the area below clear.

  3. 3. Inspect before the pour

    What could go wrong

    Loose pins, gaps, or damage

    How we control it

    Have a competent person check ties, wedges, and props.

  4. 4. Strip

    What could go wrong

    Premature stripping; falling forms; strains

    How we control it

    Strip only when the engineer or specification allows. Strip from the top down, and keep people out from under the forms.

  • Collapse of formwork during or after a pour is one of the most serious hazards in concrete work. Don't skip the check.

When to use it

Use it for each formwork operation. A competent person should check the formwork before the pour and before stripping.

Review it with the crew before the work starts, change anything that doesn't match how you'll do the job, and update it when the method, the equipment, or the site changes.

Use this JHA in Reldro

  • It arrives ready to edit, and your crew uses it on their phone, even without signal.
  • Failed items become corrective actions with an owner and a due date.
  • Every completed one is kept with the site, the date and who did it.

Goes with