Toolbox talk: concrete pour safety

Forms, pumps, and wet concrete. About 5 minutes.

  • About 5 minutes
  • 6 points
  • Attendance recorded in Reldro
Two workers looking across a concrete deck with conduit and rebar laid out

Why this matters

Pours bring a lot of people, equipment, and weight together at once, with little time to correct mistakes.

What to cover

  1. Check the forms and shoring before the pour starts.
  2. Keep people out of the swing and line of the pump hose.
  3. Wear waterproof gloves and boots, and wash off wet concrete right away.
  4. Watch the forms during the pour and stop if anything moves.
  5. Keep walkways clear and protect edges.
  6. Agree signals between the pump operator and the placing crew.

Ask the crew

  • Who watches the forms?
  • What's the stop signal?
  • Where do we wash off?

One thing to do today

Brief the crew on roles and signals before the first load arrives.

Use this toolbox talk in Reldro

  • It arrives ready to edit, and your crew uses it on their phone, even without signal.
  • Failed items become corrective actions with an owner and a due date.
  • Every completed one is kept with the site, the date and who did it.

Goes with