Job hazard analysis: installing temporary lighting

Hang and connect temporary lights in work areas, stairs, and corridors.

  • 4 steps
  • 4 PPE items
  • Editable in Reldro
A supervisor in a hard hat and high-visibility vest holding a tablet under a clear sky

The job hazard analysis

PPE required: Hard hat, Safety glasses, Gloves, Safety boots

  1. 1. Plan the circuits

    What could go wrong

    Overloaded circuits; cords across walkways

    How we control it

    Work from a plan. Use GFCI-protected supply and check the load on each circuit.

  2. 2. Hang the fixtures

    What could go wrong

    Falls from ladders; dropped fixtures

    How we control it

    Use a stable platform instead of leaning from a ladder. Secure each fixture to a fixed point, not to a cord.

  3. 3. Connect and test

    What could go wrong

    Shock from damaged cords; wet connections

    How we control it

    Inspect every cord and connector. Keep connections off the ground and out of water. Test the GFCI before use.

  4. 4. Check the result

    What could go wrong

    Dark corners; glare that hides hazards

    How we control it

    Walk the area and add lights where it's still dark, especially on stairs and at changes of level.

  • Only a qualified person should connect to a building supply or a distribution board.

When to use it

Use it when you set up lighting for a new area, or before a shift that starts or ends in the dark.

Review it with the crew before the work starts, change anything that doesn't match how you'll do the job, and update it when the method, the equipment, or the site changes.

Use this JHA in Reldro

  • It arrives ready to edit, and your crew uses it on their phone, even without signal.
  • Failed items become corrective actions with an owner and a due date.
  • Every completed one is kept with the site, the date and who did it.

Goes with