Job hazard analysis: installing insulation

Cut, fit, and spray insulation in walls, attics, and ducts.

  • 4 steps
  • 4 PPE items
  • Editable in Reldro
Two construction workers reviewing a checklist on a clipboard

The job hazard analysis

PPE required: Safety glasses, Gloves, Safety boots, Respirator or mask

  1. 1. Check the product and the space

    What could go wrong

    Fibers and fumes; hot attics

    How we control it

    Read the SDS. Ventilate the work area. Plan breaks in hot spaces.

  2. 2. Handle and cut

    What could go wrong

    Skin and eye irritation; dust

    How we control it

    Wear long sleeves, gloves, glasses, and a mask or respirator. Cut with a sharp knife.

  3. 3. Install in tight spaces

    What could go wrong

    Falls through ceilings; overheating

    How we control it

    Use walkboards across joists. Don't step between them. Carry water and work in pairs.

  4. 4. Clean up

    What could go wrong

    Loose fibers

    How we control it

    Vacuum with a suitable filter and bag waste. Shower and wash clothes after work.

  • For spray foam, follow the maker's rules on PPE, ventilation, and re-entry times.

When to use it

Use it for insulation work, and review it when the product or the location changes.

Review it with the crew before the work starts, change anything that doesn't match how you'll do the job, and update it when the method, the equipment, or the site changes.

Use this JHA in Reldro

  • It arrives ready to edit, and your crew uses it on their phone, even without signal.
  • Failed items become corrective actions with an owner and a due date.
  • Every completed one is kept with the site, the date and who did it.

Goes with