Skip to the template

Temporary power and cords checklist

Cords, GFCIs, spider boxes and generators. Get it in Reldro to edit it and use it on a phone, even without signal.

  • 6 items
  • 3 critical
  • Every week
  • Editable in Reldro
A supervisor in a hard hat and high-visibility vest holding a tablet under a clear sky

When to use this checklist

Use it weekly, and after any storm or heavy equipment movement near temporary power.

How often
Every week
Critical items
3 of the 6 items are marked critical. If a critical item fails, stop and fix it, or keep people away, before the work goes ahead.

Tips for using it

  • Tag out and remove a damaged cord right away. Don't wait for the weekly walk.
  • Press the test button to check that GFCI protection works.
  • Write down what failed and who will fix it by when. A failed item with no owner often comes back.
  • Edit the list to match your site and your procedures before you use it with a crew.

Common questions

What's on a temporary power and cords checklist?

It has 6 checks: GFCI protection is used and tested; Cords have no cuts, exposed wires or missing grounding pins; Cords are protected from vehicles and pinch points; Spider boxes and panels are dry and covered; Extension cords are the right size for the load; Damaged cords are tagged out and removed. 3 of them are critical.

How often should you do a temporary power and cords checklist?

Every week. Use it weekly, and after any storm or heavy equipment movement near temporary power.

What do you do when a check fails?

Write down what failed, who will fix it, and by when. If a critical check fails, stop and fix it, or keep people away from the hazard, before the work goes ahead. In Reldro, a failed check can become a corrective action with an owner and a due date.

Can you use this temporary power and cords checklist for free?

You can read it here for free. To use it, get it in Reldro. It arrives ready for you to edit to fit your site and procedures, your crew can complete it on a phone even without signal, and Reldro keeps each completed checklist with the site, the date, and who did it.

Does this checklist make a site safe or compliant?

No. It's a starting point for your own inspection. Adapt it to your procedures and the rules where you work. Reldro doesn't certify that a site or job is safe or compliant.

Last updated .

Use this checklist in Reldro

  • It arrives ready to edit, and your crew uses it on their phone, even without signal.
  • Failed items become corrective actions with an owner and a due date.
  • Every completed one is kept with the site, the date and who did it.

Goes with

More electrical work checklists