Overhead line clearance checklist
Before work near overhead lines. Get it in Reldro to edit it and use it on a phone, even without signal.
- 6 items
- 2 critical
- When the work happens
- Editable in Reldro

When to use this checklist
Use it before any work, lift, or vehicle movement near overhead lines.
- How often
- When the work happens
- Critical items
- 2 of the 6 items are marked critical. If a critical item fails, stop and fix it, or keep people away, before the work goes ahead.
Tips for using it
- Get the clearance distance from the utility, not from guesswork.
- Assign a spotter who has no other job.
- Write down what failed and who will fix it by when. A failed item with no owner often comes back.
- Edit the list to match your site and your procedures before you use it with a crew.
Common questions
What's on a overhead line clearance checklist?
It has 6 checks: Lines are identified and marked; Required clearance is confirmed with the utility; Spotter is assigned; Equipment paths are planned to stay clear; Warning signs are in place; Crew knows what to do if a line is contacted. 2 of them are critical.
How often should you do a overhead line clearance checklist?
When the work happens. Use it before any work, lift, or vehicle movement near overhead lines.
What do you do when a check fails?
Write down what failed, who will fix it, and by when. If a critical check fails, stop and fix it, or keep people away from the hazard, before the work goes ahead. In Reldro, a failed check can become a corrective action with an owner and a due date.
Can you use this overhead line clearance checklist for free?
You can read it here for free. To use it, get it in Reldro. It arrives ready for you to edit to fit your site and procedures, your crew can complete it on a phone even without signal, and Reldro keeps each completed checklist with the site, the date, and who did it.
Does this checklist make a site safe or compliant?
No. It's a starting point for your own inspection. Adapt it to your procedures and the rules where you work. Reldro doesn't certify that a site or job is safe or compliant.
Last updated .
Use this checklist in Reldro
- It arrives ready to edit, and your crew uses it on their phone, even without signal.
- Failed items become corrective actions with an owner and a due date.
- Every completed one is kept with the site, the date and who did it.
Goes with
More electrical work checklists
Electrical room and panel walk checklistPanels, working clearance and labels.6 items · Every week
Energized equipment pre-work checklistA readiness check, not a replacement for your own energized work procedure.6 items · When the work happens
Temporary power and cords checklistCords, GFCIs, spider boxes and generators.6 items · Every week
Generator pre-start checklistBefore running a portable generator.6 items · When the work happens