Skip to the template

Toolbox talk: calling before you dig

Find buried services before you hit them. About 5 minutes.

  • About 5 minutes
  • 6 points
  • Attendance recorded in Reldro
A worker guiding a concrete chute while pouring a slab

Why this matters

Striking a gas, electrical, or water line can hurt people and shut down a neighborhood.

What to cover

  1. Request a locate before you dig, every time.
  2. Wait for the marks and check them against the plans.
  3. Treat unmarked lines as live.
  4. Use hand tools or vacuum methods near marked lines.
  5. Keep the locate record on site.
  6. If you hit a line, stop, keep people away, and call the owner and the emergency number.

Ask the crew

  • Who requests locates on this site?
  • How long are locates good for?
  • What do you do if you hit a line?

One thing to do today

Check the locate records for today's dig.

Use this toolbox talk in Reldro

  • It arrives ready to edit, and your crew uses it on their phone, even without signal.
  • Failed items become corrective actions with an owner and a due date.
  • Every completed one is kept with the site, the date and who did it.

Goes with