Skip to the template

Job hazard analysis: framing with wood

Build and raise wood-framed walls and floors.

  • 4 steps
  • 5 PPE items
  • Editable in Reldro
Two people on a scaffold platform looking over an open building site

The job hazard analysis

PPE required: Hard hat, Safety glasses, Gloves, Safety boots, Hearing protection

  1. 1. Set out and cut

    What could go wrong

    Saw injuries; noise; dust

    How we control it

    Use guards and sharp blades. Wear hearing and eye protection. Support long cuts.

  2. 2. Assemble

    What could go wrong

    Nail gun injuries; strains

    How we control it

    Follow the nail gun JHA. Use proper posture, and share heavy lifts.

  3. 3. Raise walls

    What could go wrong

    Walls falling during the lift; crushing

    How we control it

    Use enough people or a crane. Brace the wall right away. Keep people clear of the fall zone.

  4. 4. Work at height

    What could go wrong

    Falls from edges and openings

    How we control it

    Protect edges and openings before you work. Don't work on unbraced walls.

  • Temporary bracing needs to stay in place until the permanent bracing is complete.

When to use it

Use it for framing crews, and review it when you start raising walls or work above the first floor.

Review it with the crew before the work starts, change anything that doesn't match how you'll do the job, and update it when the method, the equipment, or the site changes.

Use this JHA in Reldro

  • It arrives ready to edit, and your crew uses it on their phone, even without signal.
  • Failed items become corrective actions with an owner and a due date.
  • Every completed one is kept with the site, the date and who did it.

Goes with